Project Pulse

The final resting place for old RPs.
Locked
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Project Pulse

#1

Post by English Channel Union »

A team of University Students at the Winnipegosis Atomic Research Insitute had recently submitted a research paper to the Atomic Ministry, upon review the Institute was contacted to establish further research into this team's study, and they will be included along with some senior faculty in the university. The team submitted a case study in regards to utilizing a Minature Reactor to power a device with a U235 lining which will be subjected to a large neutron flux within the core of the device, the fission produced from this flux would create excited plasma in the tube with an inverse population of energy levels, this device will then utilize this state to eliminate a threat.

The Winnipegosis Atomic Research Insitute will place an order to the IAUE and an application to the Alliance to obtain 5 kg U235. Furthermore, the Institute will order a large stockpile of Argon, Krypton, and Helium3 gas for use in testing.
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: Project Pulse

#2

Post by English Channel Union »

the Argon, Krypton, and Helium3 gasses have been delivered to the Research Insitute and have been moved into the laboratory assigned for this project, the U235 has not been delivered yet and is not scheduled to arrive until the team has constructed the Reactor Core and connected it to the Operating Device, once these goals have been met the U235 will be supplied for the Core and Lining.

A Team of Winnipegosis Engineers will begin assembling the Reactor Core and its enclosed cooling system, while the Scientists continue to run calculations on how to properly configure the Core to produce enough power into the Capacitors for initialization and then provide enough stable power to sustain its operation.

Core Construction = 6%
Core Housing = 0%
Enclosed Cooling/Steam System = 4%

Weapon Device Housing = 4%
Weapon Device Configuration (Gasseous) = 2%
Weapon U235 Lining: 0%

The connection between Weapon and Reactor/Capacitors = 0%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: Project Pulse

#3

Post by English Channel Union »

Work will continue on assembling the core and weapon system for testing;

Core Construction = 11%
Core Housing = 0%
Enclosed Cooling System = 14%

Weapon Device Housing = 16%
Weapon Device Configuration (Gasseous Mix) = 5%
Weapon U235 Lining: 0%

The connection between Weapon and Reactor/Capacitors = 0%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: Project Pulse

#4

Post by English Channel Union »

Work will continue on assembling the core and weapon system for testing;

Core Construction = 40%
Core Housing = 10%
Enclosed Cooling System = 35%

Weapon Device Housing = 35%
Weapon Device Configuration (Gasseous Mix) = 40%
Weapon U235 Lining: 0%

The connection between Weapon and Reactor/Capacitors = 0%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: Project Pulse

#5

Post by English Channel Union »

Work will continue on assembling the core and weapon system for testing;

Core Construction = 80%
Core Housing = 60%
Enclosed Cooling System = 95%

Weapon Device Housing = 80%
Weapon Device Configuration (Gasseous Mix) = 90%
Weapon (1Kg) U235 Lining: 10%

The connection between Weapon and Reactor/Capacitors = 0%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: Project Pulse

#6

Post by English Channel Union »

Work will continue on assembling the core and weapon system for testing;

Core Construction = 90%
Core Housing = 80%
Enclosed Cooling System = 100%

Weapon Device Housing = 90%
Weapon Device Configuration (Gasseous Mix) = 100%
Weapon (1Kg) U235 Lining: 20%

The connection between Weapon and Reactor/Capacitors = 5%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: Project Pulse

#7

Post by English Channel Union »

Work will continue on assembling the core and weapon system for testing;

Core Construction = 100%
Core Housing = 100%
Enclosed Cooling System = 100%

Weapon Device Housing = 100%
Weapon Device Configuration (Gasseous Mix) = 100%
Weapon (1Kg) U235 Lining: 50%

The connection between Weapon and Reactor/Capacitors = 20%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: Project Pulse

#8

Post by English Channel Union »

Work will continue on assembling the core and weapon system for testing;

Core Construction = 100%
Core Housing = 100%
Enclosed Cooling System = 100%

Weapon Device Housing = 100%
Weapon Device Configuration (Gasseous Mix) = 100%
Weapon (1Kg) U235 Lining: 100%

The connection between Weapon and Reactor/Capacitors = 50%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: Project Pulse

#9

Post by English Channel Union »

Core Construction = 100%
Core Housing = 100%
Enclosed Cooling System = 100%

Weapon Device Housing = 100%
Weapon Device Configuration (Gasseous Mix) = 100%
Weapon (1Kg) U235 Lining: 100%

The connection between Weapon and Reactor/Capacitors = 100%

Project Pulse will be completed - Currently its testing has been put on hold until its platform is ready.
Democracy thrives with the Atom

The Atomic Seal
Moved from Statescraft to RP Archive on Sat Feb 10, 2024 4:37 pm by Alanston

Locked

Who is online

Users browsing this forum: No registered users and 6 guests