I need more Yellowcake

The final resting place for old RPs.
Locked
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

I need more Yellowcake

#1

Post by English Channel Union »

Current Assembly Facilities;
Blind River Facility (Refinery, Assembly, Storage)
Thessalon Facility (Refinery, Assembly, Storage)
Candle Lake Facility (Refinery, Assembly, Storage)
Port Hope Facility (Refinery, Assembly, Storage)

The Alliance has determined, in order to successfully meet the doctrinal requirements of the Atomic Military they must begin the expansion of their Assembly and Refinement Facilities, therefor the Alliance has begun searching for construction contractors in the following regions;

Red Rock, ON (Refinery, Storage)
Cobourg, ON (Refinery, Storage)
Victoria Beach, MB (Refinery, Storage)
Albert Beach, MB (Refinery, Assembly, Storage)
Hillside Beach, MB (Assembly, Storage)
Little Black River, MB (Refinery, Assembly, Storage)
Silver Harbour, MB (Refinery, Assembly, Storage)

New Refineries Planned = 6
New Assembly Facilities Planned = 4
Each facility features a storage facility for its produced products.

The Ministry of Interior will be evaluating the contractors for these contracts, furthermore, they will contact the Ontario and Manitoba governments to begin the purchase process of open plots/uninhabited plots of land.
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: I need more Yellowcake

#2

Post by English Channel Union »

Red Rock, ON (Refinery, Storage)
Following the approval of the Construction Permits and permission from the ARC the Alliance will see the Arrival of local construction companies along with Concrete and Steel for the Foundation and Structure of the Facility. Workers will begin by unloading the Steel from the arriving supply trucks and consolidating it in a supply group. Red Rock will await the arrival of Digging equipment so they can construct the foundation.

Cobourg, ON (Refinery, Storage)
Following the approval of the Construction Permits and permission from the ARC the Alliance will see the Arrival of local construction along with the arrival of Digging equipment so they can start the layout of the foundation. Steel will be ordered and arriving shortly.

Foundation Excavation = 5%

Victoria Beach, MB (Refinery, Storage)
Following the approval of the Construction Permits and permission from the ARC the Alliance will see the Arrival of local construction companies along with Concrete and Steel for the Foundation and Structure of the Facility. Workers will begin by unloading the Steel from the arriving supply trucks and consolidating it in a supply group. Victoria Beach will await the arrival of Digging equipment so they can construct the foundation.

Albert Beach, MB (Refinery, Assembly, Storage)
Following the approval of the Construction Permits and permission from the ARC the Alliance will see the Arrival of local construction along with the arrival of Digging equipment so they can start the layout of the foundation. Steel will be ordered and arriving shortly.

Since the Arrival of the equipment, the Albert Beach team has already begun excavation of the site.
Foundation Excavation = 5%

Hillside Beach, MB (Assembly, Storage)
Following the approval of the Construction Permits and permission from the ARC the Alliance will see the Arrival of local construction companies along with Concrete and Steel for the Foundation and Structure of the Facility. Workers will begin by unloading the Steel from the arriving supply trucks and consolidating it in a supply group. Hillside Beach will await the arrival of Digging equipment so they can construct the foundation.

Little Black River, MB (Refinery, Assembly, Storage)
Following the approval of the Construction Permits and permission from the ARC the Alliance will see the Arrival of local construction along with the arrival of Digging equipment so they can start the layout of the foundation. Steel will be ordered and arriving shortly.

Since the Arrival of the equipment, the Little Black River team has already begun excavation of the site.
Foundation Excavation = 10%
Silver Harbour, MB (Refinery, Assembly, Storage)
Following the approval of the Construction Permits and permission from the ARC the Alliance will see the Arrival of local construction along with the arrival of Digging equipment so they can start the layout of the foundation. Steel will be ordered and arriving shortly.

Since the Arrival of the equipment, the Silver Harbour team has already begun excavation of the site.
Foundation Excavation = 8%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: I need more Yellowcake

#3

Post by English Channel Union »

Red Rock, ON (Refinery, Storage)
The Digging equipment will arrive on-site, with the dig locations already marked once the vehicles are offloaded they would begin the excavation.

Foundation Excavation = 20%

Cobourg, ON (Refinery, Storage)
The Foundation Excavation will continue

Foundation Excavation = 50%

Victoria Beach, MB (Refinery, Storage)
The Digging equipment will arrive on-site, with the dig locations already marked once the vehicles are offloaded they would begin the excavation.

Foundation Excavation = 20%

Albert Beach, MB (Refinery, Assembly, Storage)
The Foundation Excavation will continue

Foundation Excavation = 45%

Hillside Beach, MB (Assembly, Storage)
The Digging equipment will arrive on-site, with the dig locations already marked once the vehicles are offloaded they would begin the excavation.

Foundation Excavation = 25%

Little Black River, MB (Refinery, Assembly, Storage)
The Foundation Excavation will continue

Foundation Excavation = 55%
Silver Harbour, MB (Refinery, Assembly, Storage)
The Foundation Excavation will continue

Foundation Excavation = 60%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: I need more Yellowcake

#4

Post by English Channel Union »

Red Rock, ON (Refinery, Storage)
The Foundation Excavation will continue

Foundation Excavation = 50%

Cobourg, ON (Refinery, Storage)
The Foundation Excavation will continue. Furthermore, Concrete teams will arrive on site to begin erecting the foundation where it has already been excavated. With this, some Labourers will begin placing the Steel Supports for the Concrete foundation.

Foundation Excavation = 80%
Steel Supports = 10%
Concrete Pouring = 5%

Victoria Beach, MB (Refinery, Storage)
The Foundation Excavation will continue


Foundation Excavation = 45%

Albert Beach, MB (Refinery, Assembly, Storage)
The Foundation Excavation will continue

Foundation Excavation = 45%

Hillside Beach, MB (Assembly, Storage)
The Foundation Excavation will continue. Furthermore, Concrete teams will arrive on site to begin erecting the foundation where it has already been excavated. With this, some Labourers will begin placing the Steel Supports for the Concrete foundation.

Foundation Excavation = 85%
Steel Supports = 5%
Concrete Pouring = 1%

Little Black River, MB (Refinery, Assembly, Storage)
The Foundation Excavation will continue. Furthermore, Concrete teams will arrive on site to begin erecting the foundation where it has already been excavated. With this, some Labourers will begin placing the Steel Supports for the Concrete foundation.

Foundation Excavation = 78%
Steel Supports = 10%
Concrete Pouring = 5%

Silver Harbour, MB (Refinery, Assembly, Storage)
The Foundation Excavation will continue. Furthermore, Concrete teams will arrive on site to begin erecting the foundation where it has already been excavated. With this, some Labourers will begin placing the Steel Supports for the Concrete foundation.

Foundation Excavation = 77%
Steel Supports = 15%
Concrete Pouring = 5%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: I need more Yellowcake

#5

Post by English Channel Union »

Red Rock, ON (Refinery, Storage)
The Foundation Excavation will continue. Furthermore, Concrete teams will arrive on site to begin erecting the foundation where it has already been excavated. With this, some Labourers will begin placing the Steel Supports for the Concrete foundation.

Foundation Excavation = 80%
Steel Supports = 10%
Concrete Pouring = 5%

Cobourg, ON (Refinery, Storage)
The excavation will be completed, work will now be focused on pouring the foundation. Since the Foundation Layers are almost completed the next team of workers will begin to arrive onsite with their equipment. These workers will construct the building's frame and the layout of the facility.

Foundation Excavation = 100%
Steel Supports = 30%
Concrete Pouring = 15%
Steel Framing = 0%

Victoria Beach, MB (Refinery, Storage)
The Foundation Excavation will continue. Furthermore, Concrete teams will arrive on site to begin erecting the foundation where it has already been excavated. With this, some Labourers will begin placing the Steel Supports for the Concrete foundation.


Foundation Excavation = 75%
Steel Supports = 10%
Concrete Pouring = 5%

Albert Beach, MB (Refinery, Assembly, Storage)
The Foundation Excavation will continue. Furthermore, Concrete teams will arrive on site to begin erecting the foundation where it has already been excavated. With this, some Labourers will begin placing the Steel Supports for the Concrete foundation.

Foundation Excavation = 80%
Steel Supports = 15%
Concrete Pouring = 10%

Hillside Beach, MB (Assembly, Storage)
The excavation will be completed, work will now be focused on pouring the foundation. Since the Foundation Layers are almost completed the next team of workers will begin to arrive onsite with their equipment. These workers will construct the building's frame and the layout of the facility.

Foundation Excavation = 85%
Steel Supports = 20%
Concrete Pouring = 10%
Steel Framing = 0%

Little Black River, MB (Refinery, Assembly, Storage)
The excavation will be completed, work will now be focused on pouring the foundation. Since the Foundation Layers are almost completed the next team of workers will begin to arrive onsite with their equipment. These workers will construct the building's frame and the layout of the facility.

Foundation Excavation = 78%
Steel Supports = 10%
Concrete Pouring = 25%
Steel Framing = 15%

Silver Harbour, MB (Refinery, Assembly, Storage)
The excavation will be completed, work will now be focused on pouring the foundation. Since the Foundation Layers are almost completed the next team of workers will begin to arrive onsite with their equipment. These workers will construct the building's frame and the layout of the facility.

Foundation Excavation = 77%
Steel Supports = 30%
Concrete Pouring = 20%
Steel Framing = 0%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: I need more Yellowcake

#6

Post by English Channel Union »

Red Rock, ON (Refinery, Storage)
The excavation will be completed, work will now be focused on pouring the foundation. Since the Foundation Layers are almost completed the next team of workers will begin to arrive onsite with their equipment. These workers will construct the building's frame and the layout of the facility.

Foundation Excavation = 100%
Steel Supports = 30%
Concrete Pouring = 20%
Steel Framing = 0%

Cobourg, ON (Refinery, Storage)
Work will continue on the foundation, the Steel Beams for the frame of the buildings will begin to arrive on the site with workers unloading all of the materials and preparing them for installation.

Foundation Excavation = 100%
Steel Supports = 65%
Concrete Pouring = 40%
Steel Framing = 0%

Victoria Beach, MB (Refinery, Storage)
The excavation will be completed, work will now be focused on pouring the foundation. Since the Foundation Layers are almost completed the next team of workers will begin to arrive onsite with their equipment. These workers will construct the building's frame and the layout of the facility.


Foundation Excavation = 100%
Steel Supports = 25%
Concrete Pouring = 15%
Steel Framing = 0%

Albert Beach, MB (Refinery, Assembly, Storage)
The excavation will be completed, work will now be focused on pouring the foundation. Since the Foundation Layers are almost completed the next team of workers will begin to arrive onsite with their equipment. These workers will construct the building's frame and the layout of the facility.

Foundation Excavation = 100%
Steel Supports = 30%
Concrete Pouring = 20%
Steel Framing = 0%

Hillside Beach, MB (Assembly, Storage)
Work will continue on the foundation, the Steel Beams for the frame of the buildings will begin to arrive on the site with workers unloading all of the materials and preparing them for installation.

Foundation Excavation = 100%
Steel Supports = 60%
Concrete Pouring = 55%
Steel Framing = 0%

Little Black River, MB (Refinery, Assembly, Storage)
Work will continue on the foundation, the Steel Beams for the frame of the buildings will begin to arrive on the site with workers unloading all of the materials and preparing them for installation.

Foundation Excavation = 100%
Steel Supports = 55%
Concrete Pouring = 50%
Steel Framing = 0%

Silver Harbour, MB (Refinery, Assembly, Storage)
Work will continue on the foundation, the Steel Beams for the frame of the buildings will begin to arrive on the site with workers unloading all of the materials and preparing them for installation.

Foundation Excavation = 100%
Steel Supports = 55%
Concrete Pouring = 45%
Steel Framing = 0%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: I need more Yellowcake

#7

Post by English Channel Union »

Red Rock, ON (Refinery, Storage)
All work on the facilities' structure and Utilities will be completed.
Structure Supports & Laying = 100%
Electrical Layout = 100%
Utilities & Operation Transfer Facilities = 100%

Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 50%
Installation of the Heat Extraction Equipment = 25%

Work will be underway on the construction of a Storage Facility
Storage Facility = 50%


Cobourg, ON (Refinery, Storage)
All work on the facilities' structure and Utilities will be completed.
Structure Supports & Laying = 100%
Electrical Layout = 100%
Utilities & Operation Transfer Facilities = 100%

Work be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 75%
Installation of the Heat Extraction Equipment = 50%

Work will be underway on the construction of a Storage Facility
Storage Facility = 50%

Victoria Beach, MB (Refinery, Storage)
All work on the facilities' structure and Utilities will be completed.
Structure Supports & Laying = 100%
Electrical Layout = 100%
Utilities & Operation Transfer Facilities = 100%

Work be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 50%
Installation of the Heat Extraction Equipment = 25%

Work will be underway on the construction of a Storage Facility
Storage Facility = 50%

Structure Supports & Laying = 50%

Albert Beach, MB (Refinery, Assembly, Storage)
All work on the facilities' structure and Utilities will be completed.
Structure Supports & Laying = 100%
Electrical Layout = 100%
Utilities & Operation Transfer Facilities = 100%

Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 50%
Installation of the Heat Extraction Equipment = 25%

Work will be underway on the construction of a Storage Facility
Storage Facility = 50%

Hillside Beach, MB (Assembly, Storage)
All work on the facilities' structure and Utilities will be completed.
Structure Supports & Laying = 100%
Electrical Layout = 100%
Utilities & Operation Transfer Facilities = 100%

Work will be underway on the Assembly Equipment
Installation of Assembly Facilities = 50%

Work will be underway on the construction of a Storage Facility
Storage Facility = 50%

Little Black River, MB (Refinery, Assembly, Storage)
All work on the facilities' structure and Utilities will be completed.
Structure Supports & Laying = 100%
Electrical Layout = 100%
Utilities & Operation Transfer Facilities = 100%

Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 75%
Installation of the Heat Extraction Equipment = 50%

Work will be underway on the construction of a Storage Facility
Storage Facility = 50%

Silver Harbour, MB (Refinery, Assembly, Storage)
All work on the facilities' structure and Utilities will be completed.
Structure Supports & Laying = 100%
Electrical Layout = 100%
Utilities & Operation Transfer Facilities = 100%

Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 75%
Installation of the Heat Extraction Equipment = 50%

Work will be underway on the construction of a Storage Facility
Storage Facility = 50%
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: I need more Yellowcake

#8

Post by English Channel Union »

Red Rock, ON (Refinery, Storage)
Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 50%

Work will be underway on the construction of a Storage Facility
Storage Facility = 100%


Cobourg, ON (Refinery, Storage)
Work be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 75%

Work will be underway on the construction of a Storage Facility
Storage Facility = 100%

Victoria Beach, MB (Refinery, Storage)
Work be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 50%

Work will be underway on the construction of a Storage Facility
Storage Facility = 100%

Albert Beach, MB (Refinery, Assembly, Storage)
Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 50%

Work will be underway on the construction of a Storage Facility
Storage Facility = 100%

Hillside Beach, MB (Assembly, Storage)
Work will be underway on the Assembly Equipment
Installation of Assembly Facilities = 100%

Work will be underway on the construction of a Storage Facility
Storage Facility = 100%

Little Black River, MB (Refinery, Assembly, Storage)
Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 75%

Work will be underway on the construction of a Storage Facility
Storage Facility = 100%

Silver Harbour, MB (Refinery, Assembly, Storage)
Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 75%

Work will be underway on the construction of a Storage Facility
Storage Facility = 100%
Last edited by English Channel Union on Thu Jun 08, 2023 11:37 pm, edited 1 time in total.
Reason: Accidental Edit
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: I need more Yellowcake

#9

Post by English Channel Union »

WAS POSTED PRIOR TO I LOVE YELLOWCAKE - ACCIDENTALLY MODIFIED LAST POST
Red Rock, ON (Refinery, Storage)
Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 75%

The Storage Facility has been completed.

Cobourg, ON (Refinery, Storage) Completed
The Facility will be completed
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 100%

The Storage Facility has been completed.

Victoria Beach, MB (Refinery, Storage)
Work be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 75%

The Storage Facility has been completed.

Albert Beach, MB (Refinery, Assembly, Storage)
Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 75%

The Storage Facility has been completed.

Hillside Beach, MB (Assembly, Storage) Completed
The Facility is Complete

The Storage Facility has been completed.

Little Black River, MB (Refinery, Assembly, Storage) Completed
The Facility will be completed
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 100%

The Storage Facility has been completed.

Silver Harbour, MB (Refinery, Assembly, Storage) Completed
The Facility will be completed
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 100%

The Storage Facility has been completed.
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: I need more Yellowcake

#10

Post by English Channel Union »

Red Rock, ON (Refinery, Storage)
Work will be underway on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 100%

The Storage Facility has been completed.

Victoria Beach, MB (Refinery, Storage) COMPLETED
Work is completed on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 100%

The Storage Facility has been completed.

Albert Beach, MB (Refinery, Assembly, Storage) COMPLETED
Work is completed on the installation of Refinery Equipment
Installation of the "Yellowcake" Process = 100%
Installation of the Heat Extraction Equipment = 100%

The Storage Facility has been completed.

Stage Two;

List of current Facilities;
Red Rock Facility (Refinery, Storage) (NEW)
Cobourg Facility (Refinery, Storage)
Blind River Facility (Refinery, Assembly, Storage) (Legacy)
Thessalon Facility (Refinery, Assembly, Storage) (Legacy)
Candle Lake Facility (Refinery, Assembly, Storage) (Legacy)
Port Hope Facility (Refinery, Assembly, Storage) (Legacy)
Hillside Beach Facility (Assembly, Storage)
Little Black River Facility (Refinery, Assembly, Storage)
Silver Harbour Facility (Refinery, Assembly, Storage)
Albert Beach Facility (Refinery, Assembly, Storage) (NEW)
Victoria Beach Facility (Refinery, Storage) (NEW)

New Projects;
The Hillside Beach Facility has been slated for an expansion of its assembly facilities, the intention is to increase its capacity by 40 Warheads/Turn, allowing a maximum production of 80 at its facility. Due to this plan, the Atomic Government has begun contracting some companies in the region to arrive on site and begin the improvement project, supplies have also been ordered and are en route to the facility.
Preparation of the Facility: 50%

The Cobourg Facility has been slated for an expansion of its refinery facility, the intention is to allow this facility to handle simultaneous proliferation procedures to increase the output of refined uranium. The Atomic Government has begun contracting some companies in the region to arrive on site and begin the improvement project, supplies have also been ordered and are en route to the facility.
Preparation of the Facility: 50%

More Projects to follow shortly.
Democracy thrives with the Atom

The Atomic Seal
User avatar
English Channel Union
Centurion
Centurion
Posts: 299
Joined: Sat Feb 18, 2023 11:56 pm

Re: I need more Yellowcake

#11

Post by English Channel Union »

Stage Two;

List of current Facilities;
Red Rock Facility (Refinery, Storage) (NEW)
Cobourg Facility (Refinery, Storage) (Upgrade I)
Blind River Facility (Refinery, Assembly, Storage) (Legacy)
Thessalon Facility (Refinery, Assembly, Storage) (Legacy)
Candle Lake Facility (Refinery, Assembly, Storage) (Legacy)
Port Hope Facility (Refinery, Assembly, Storage) (Legacy)
Hillside Beach Facility (Assembly, Storage) (Upgrade I)
Little Black River Facility (Refinery, Assembly, Storage)
Silver Harbour Facility (Refinery, Assembly, Storage)
Albert Beach Facility (Refinery, Assembly, Storage) (NEW)
Victoria Beach Facility (Refinery, Storage) (NEW)

New Projects;
Overtime the Hillside Facility is completed

Overtime the Coburg Facility is completed

Red Rock will undergo a Level II Upgrade, allowing 1 additional production capacity and 50% production posts. First, the facility will be ordered to undergo examinations for its extension and materials, along with labour contracts issued.
Preparation of the Facility: 50%
Democracy thrives with the Atom

The Atomic Seal
Moved from Statescraft to RP Archive on Sat Feb 10, 2024 4:37 pm by Alanston

Locked

Who is online

Users browsing this forum: No registered users and 5 guests