Page 3 of 3
Re: (Super)Critical Simulations
Posted: Wed Apr 19, 2023 11:17 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th and 5th order of 20 weapons each were completd too.
A 6th order of 20 weapons is placed.
Assembly level of Bombs, 6th order: 0%
Re: (Super)Critical Simulations
Posted: Thu Apr 20, 2023 10:57 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th and 5th order of 20 weapons each were completd too.
A 6th order of 20 weapons is placed.
Assembly level of Bombs, 6th order: 25%
Re: (Super)Critical Simulations
Posted: Fri Apr 21, 2023 10:34 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th and 5th order of 20 weapons each were completd too.
A 6th order of 20 weapons is placed.
Assembly level of Bombs, 6th order: 50%
Re: (Super)Critical Simulations
Posted: Sat Apr 22, 2023 10:43 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th and 5th order of 20 weapons each were completd too.
A 6th order of 20 weapons is placed.
Assembly level of Bombs, 6th order: 75%
Re: (Super)Critical Simulations
Posted: Sun Apr 23, 2023 10:02 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The great expertise acquired by the NCR in manufacturing nuclear weapons allows to streamline and increase production easily. This, coupled with ordering new specialized machines, will allow to complete bigger orders in the same time.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th, 5th and 6th order of 20 weapons each were completd and mounted too.
A 7th order of 60 weapons is placed.
Assembly level of Bombs, 7th order: 25%
Re: (Super)Critical Simulations
Posted: Mon Apr 24, 2023 9:50 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The great expertise acquired by the NCR in manufacturing nuclear weapons allows to streamline and increase production easily. This, coupled with ordering new specialized machines, will allow to complete bigger orders in the same time.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th, 5th and 6th order of 20 weapons each were completd and mounted too.
A 7th order of 60 weapons is placed.
Assembly level of Bombs, 7th order: 50%
Re: (Super)Critical Simulations
Posted: Tue Apr 25, 2023 10:58 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The great expertise acquired by the NCR in manufacturing nuclear weapons allows to streamline and increase production easily. This, coupled with ordering new specialized machines, will allow to complete bigger orders in the same time.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th, 5th and 6th order of 20 weapons each were completd and mounted too.
A 7th order of 60 weapons is placed.
Assembly level of Bombs, 7th order: 75%
Re: (Super)Critical Simulations
Posted: Wed Apr 26, 2023 10:29 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The great expertise acquired by the NCR in manufacturing nuclear weapons allows to streamline and increase production easily. This, coupled with ordering new specialized machines, will allow to complete bigger orders in the same time.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th, 5th and 6th order of 20 weapons each were completd and mounted too.
A 7th order of 60 weapons was completd and mounted too.
A 8th order of 60 weapons is placed.
Assembly level of Bombs, 8th order: 0%
Re: (Super)Critical Simulations
Posted: Thu Apr 27, 2023 10:47 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The great expertise acquired by the NCR in manufacturing nuclear weapons allows to streamline and increase production easily. This, coupled with ordering new specialized machines, will allow to complete bigger orders in the same time.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th, 5th and 6th order of 20 weapons each were completd and mounted too.
A 7th order of 60 weapons was completd and mounted too.
A 8th order of 60 weapons is placed.
Assembly level of Bombs, 8th order: 25%
Re: (Super)Critical Simulations
Posted: Fri Apr 28, 2023 10:26 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The great expertise acquired by the NCR in manufacturing nuclear weapons allows to streamline and increase production easily. This, coupled with ordering new specialized machines, will allow to complete bigger orders in the same time.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th, 5th and 6th order of 20 weapons each were completd and mounted too.
A 7th order of 60 weapons was completd and mounted too.
A 8th order of 60 weapons is placed.
Assembly level of Bombs, 8th order: 50%
Re: (Super)Critical Simulations
Posted: Sat Apr 29, 2023 10:40 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The great expertise acquired by the NCR in manufacturing nuclear weapons allows to streamline and increase production easily. This, coupled with ordering new specialized machines, will allow to complete bigger orders in the same time.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th, 5th and 6th order of 20 weapons each were completd and mounted too.
A 7th order of 60 weapons was completd and mounted too.
A 8th order of 60 weapons is placed.
Assembly level of Bombs, 8th order: 75%
Re: (Super)Critical Simulations
Posted: Sun Apr 30, 2023 10:41 am
by NCR
All the needed storages are completed.
The 4th expansion of the manufacturing plants was completed. The expansion rate was increased 2 times; the second expansion was particularly sizable, and as such new orders will be bigger and proceed faster.
For now, the expansion of the manufacturing plants will stop.
The great expertise acquired by the NCR in manufacturing nuclear weapons allows to streamline and increase production easily. This, coupled with ordering new specialized machines, will allow to complete bigger orders in the same time.
The first 3 orders, consisting of 5 weapons each, were completed; the devices are already mounted properly and ready for use.
The 4th, 5th and 6th orders of 20 weapons each were completd and mounted too.
The 7th and 8th orders of 60 weapons each were completd and mounted too.
A 9th order of 60 weapons is placed.
Assembly level of Bombs, 9th order: 0%
Re: (Super)Critical Simulations
Posted: Sun May 07, 2023 7:40 pm
by NCR
[skipping ahead due to time passed]
The 9th and last order of weapons is completed and mounted.
The assembly program is temporarely put on hold due to satisfaction in the obtained number of bombs.
As such, the total number of orders are:
1 order of working prototypes of 10 weapons;
3 orders of 5 weapons each;
3 orders of 20 weapons each;
3 orders of 60 weapons each;
For a grand total of 265 weapons, mounted and ready for use.